The Dubai International Holy Quran Award

Room 2 view2 (1) </h2 > The Dubai International Holy Quran Award is sponsored by H.H. Shk. Mohamed Bin Rashid Al Maktoum is given each year to people who memorize and recite the Quran. The Award was established to encourage young Muslims to memorize and understand the Holy Quran, and to spread the Quranic values of peace and love. Located in Mamzar in Dubai, Dubai Holy Quran Building will be one of the city’s most symbolically important new projects. The building is conceived in response to the city’s rapidly growing population and limited facilities of such type. The design is traditional, offering an image of dignity, transparency, and openness. The building has lots of antique and delicate Rugs and photo frames which are meant to be preserved in a proper display manner. Thus the initial idea arose for creating a space to display Rugs and Frames inside the Holy Quran building. The design consists of display units for photo frames and rug units for Rugs Each room comprises rugs and larger frames, which are attached to the wall, and also the bigger rugs are provided with separate units. The interior planning has a wide Islamic ornamental touch that enhances the complete space. view3 view2 view1 Room 4 view3 Room 4 view2 (1) Room 4 view1 (1) Room 3 view2 Room 3 view1 (2) Room 2 view3 Room 2 view2 (1)
The First Investors

WhatsApp Image 2023-12-05 at 10.36.22 AM </h2 > First Investors is a valued client with whom we have the privilege of collaborating. If any projects are assigned by their own clients, we ensure prompt communication with Mechline Eurotek Contracting. Our team is currently conducting a thorough site inspection to assess its condition, and we will subsequently provide a comprehensive quotation that offers both competitive pricing and exceptional quality. Based on this Mechline Eurotek Contracting has submitted a quotation to Saga Mall, which has been met with satisfaction from the client who fully comprehends the detailed work description. Upon completion of the project, the client expressed happiness and complete satisfaction. WhatsApp Image 2023-12-05 at 10.36.23 AM (1) WhatsApp Image 2023-12-05 at 10.36.23 AM WhatsApp Image 2023-12-05 at 10.36.24 AM WhatsApp Image 2023-12-05 at 10.37.07 AM WhatsApp Image 2023-12-05 at 10.36.20 AM WhatsApp Image 2023-12-05 at 10.36.22 AM (1) WhatsApp Image 2023-12-05 at 10.36.22 AM
Big OB Van

a794460e-c068-4e2d-837e-485af90fb930 </h2 > Map Events & Art Production FZE is our new client who was referred by one of our existing clients. Further request, and as per meeting had with you at your office and the work outline given to us and further to the site visit, we are interested to submit our most competitive proposal for internal fit out work and Renovation work for the Old Big OB van vehicle, size – L- 1230cm X W- 250+88cm X H- 260cm. Mechline Eurotek Contracting has done various work at the OB Van. Side Panel Insulation. Electrical work. Desk work. Roof work. Ac work. Mechline Eurotek the work is finished within the agreed time frame to uphold our commitment to our new client and upholding the trust of our existing client 49bb4625-bf4b-472b-86a6-a17f8b125185 72ed17a4-6556-42bd-8729-5efe5435cdaf 97b9c9d6-6fb7-4838-bf32-60b3f9fa17dc 479f5719-812b-4843-9bc3-674bede9fdce 4508d03b-368b-49a6-a51e-2332019399d1 6001a3c0-111f-47c2-aefb-ef40f87855e4 9024a860-9c4a-49da-8668-c67bb8f5cd96 9238d5f4-3eed-4001-a007-72500c150906 15244925-b94c-46aa-8c0a-c984d8563cb9 a794460e-c068-4e2d-837e-485af90fb930 Load More End of Content.
Av Solutions FZCO

AV solutions OB Van Refubrishment work (14) </h2 > Av Solution FZCO is our new client who was referred by one of our existing clients. The client requires some additional work to be done on their OB Van. In response to the client’s request, a meeting was scheduled at their office to discuss the project. Mechline Eurotek Contracting has provided a detailed quote that breaks down the prices for the different scopes of work involved. Mechline Eurotek Contracting has done various work at the OB Van. Electrical Cabling Wooden Paneling Aero flex Insulation inside the Vehicle Panel RPC Synthetic Flooring Installing a new Acrylic Sheet ceiling at Center Portion RPC Tiles for the Car Wall, rooftop & Car Floor Light Fitting and Related Cable Works Switches with Dimmer Controls Mechline Eurotek the work is finished within the agreed time frame to uphold our commitment to our new client and upholding the trust of our existing client and AV Solution FZCO. AV solutions OB Van Refubrishment work (4) AV solutions OB Van Refubrishment work (5) AV solutions OB Van Refubrishment work (6) AV solutions OB Van Refubrishment work (7) AV solutions OB Van Refubrishment work (8) AV solutions OB Van Refubrishment work (10) AV solutions OB Van Refubrishment work (11) AV solutions OB Van Refubrishment work (12) AV solutions OB Van Refubrishment work (13) AV solutions OB Van Refubrishment work (14) Load More End of Content.
Irish Village

WhatsApp Image 2024-04-27 at 11.26.41 AM </h2 > We thank you for your enquiry towards setting up Irish Village Outlet in Dubai Expo Site. Refer to your request from the client we inspected the site and carried out full detailed survey, based on that we are send the Quote with detailed Scope of work and Best Price. Screeding and Foundation Work Container Supply and Setting up Plumbing Work for the Outlet Electrical Work for the Outlet Fire Protection System for Outlet Air-conditioning Unit for the outlet Worktop and cabinets for the outlet Exterior Cladding for the Outlet Consultation Charges INTERIOR WORK & EXTERIOR WORKS Office/Storage Container BAR Container Kitchen Container Mechline Eurotek Contracting has submitted a quotation to Irish village, which has been met with satisfaction from the client who fully comprehends the detailed work description. Upon completion of the project, the client expressed happiness and complete satisfaction. WhatsApp Image 2024-04-27 at 11.27.00 AM WhatsApp Image 2024-04-27 at 11.27.30 AM WhatsApp Image 2024-04-27 at 11.28.19 AM WhatsApp Image 2024-04-27 at 11.28.47 AM WhatsApp Image 2024-04-27 at 11.29.06 AM WhatsApp Image 2024-04-27 at 11.26.20 AM WhatsApp Image 2024-04-27 at 11.26.41 AM
Original Marines

OM_Dubai Mall_Front elev </h2 > We are delighted to provide a quotation for the fit out work for Original Marines, in response to the request that was registered and the site inspection that was conducted. Please find below the scope of work and our highly competitive price for the aforementioned project. Mobilisation and Preliminary Works Drywall Partition and False Ceiling Works HVAC Works Electrical Works Glass Works Furniture Installations Works Paint Finish Works Flooring Works Camera and Speaker Works Fire Fighting System Works Mechline Eurotek has successfully completed the work within the agreed time frame in order to honour our commitment to our new client and maintain the trust of our existing client. OM_Dubai Mall_Int 01 OM_Dubai Mall_Int 02 WhatsApp Image 2020-10-25 at 9.06.24 PM WhatsApp Image 2020-10-25 at 9.06.25 PM OM_Dubai Mall_Front elev