The First Investor

WhatsApp Image 2024-04-13 at 10.44.09 AM (1) </h2 > Chiller Water Pipe Insulation Replacement First Investors is a valued client with whom we have the privilege of collaborating. If any projects are assigned by their own clients, we ensure prompt communication with Mechline Eurotek Contracting. Refer to your request from the client we inspected the building and carried out full detailed survey, based on that we are send the Quote with detailed Scope of work and Best Price. Mechline Eurotek Contracting carried out the work as per the below mentioned Building Floor Details: Basement- 3 Floor + Ground floor + Mezz Floor + 1 to 16 Floor + HC Floor (17 Floor) Apartment: 2BHK, 3BHK, 4BHK Total Pipe Length – 2391mt (Supply & Return Pipe Line) Total FCU – 120 Nos Total Gypsum Celling Opening – 1800sqmt. Regarding these measurements, we successfully finished the entire ceiling installation and insulation of the chiller water pipes. The completion of this task was accomplished within the agreed-upon timeframe. Following the conclusion of the project, Mechline Eurotek Contracting provided a comprehensive report on the building’s completion, That includes the signature of each tenant residing in the apartments. Currently, our client expresses contentment with our work, and the tenants also express their satisfaction. WhatsApp Image 2024-04-13 at 10.44.04 AM (1) WhatsApp Image 2024-04-13 at 10.44.04 AM WhatsApp Image 2024-04-13 at 10.44.05 AM (1) WhatsApp Image 2024-04-13 at 10.44.05 AM WhatsApp Image 2024-04-13 at 10.44.06 AM (1) WhatsApp Image 2024-04-13 at 10.44.06 AM WhatsApp Image 2024-04-13 at 10.44.07 AM WhatsApp Image 2024-04-13 at 10.44.08 AM (1) WhatsApp Image 2024-04-13 at 10.44.08 AM WhatsApp Image 2024-04-13 at 10.44.09 AM (1) Load More End of Content.
The First Investors

WhatsApp Image 2023-08-10 at 5.13.35 PM </h2 > First Investors is a highly esteemed client with whom we are fortunate to have a collaborative partnership. In the event that their clients assign any projects, we make it a priority to maintain timely and effective communication with Mechline Eurotek Contracting. In response to your client’s request, we thoroughly inspected the building and conducted a comprehensive survey. Based on this assessment, we have prepared a detailed Quote outlining the Scope of work and providing the Best Price. Mechline Eurotek Contracting has successfully executed the assigned tasks in accordance with the following specifications. Removing Existing ACB panel with new ACB with Busbars and Necessary Accessories in Existing Enclosure Cubicle At site. Required power Shutdown 8-10 Hours Of Duration. The work has been completed successfully, meeting the agreed-upon deadline. Mechline Eurotek Contracting has delivered a detailed report on the project’s completion, which includes the signatures of all tenants in the apartments. Our client is pleased with our services, and the tenants are also satisfied. WhatsApp Image 2023-08-10 at 5.12.07 PM (4) WhatsApp Image 2023-08-10 at 5.12.07 PM WhatsApp Image 2023-08-10 at 5.12.08 PM (1) WhatsApp Image 2023-08-10 at 5.12.08 PM (2) WhatsApp Image 2023-08-10 at 5.12.08 PM WhatsApp Image 2023-08-10 at 5.13.34 PM (1) WhatsApp Image 2023-08-10 at 5.13.34 PM WhatsApp Image 2023-08-10 at 5.13.35 PM (1) WhatsApp Image 2023-08-10 at 5.13.35 PM (2) WhatsApp Image 2023-08-10 at 5.13.35 PM Load More End of Content.
Al showaib Real estate

WhatsApp Image 2023-08-09 at 10.53.14 AM (1) </h2 > Al Showaib Real Estate manages the Deira Tower Building. Should any repairs be required, clients can contact Mechline Eurotek Contracting, and the matter will be promptly attended to. Reference to the Frequent complaint on train chiller tripping we had carried out testing of the building Main Earth system. Removing the existing 4 nos. earth pit covers the building external area. Remove the old corrode rods and accessories. New vertical boring and install new copper bonded rods and accessories, after installation , check the earthing Parameters log it. Put back the earth pit cover. Consequently, a service request was received from the site. Mechline Eurotek Contracting has delivered a quotation for the essential repairs at a competitive price and successfully completed the project within the agreed-upon timeframe. WhatsApp Image 2023-08-09 at 10.53.14 AM WhatsApp Image 2023-08-09 at 12.18.50 PM WhatsApp Image 2023-08-11 at 6.42.34 AM WhatsApp Image 2023-08-09 at 10.53.14 AM (1)
Al showaib Real Estate

20141027_104733 </h2 > According to our periodically maintenance we are carrying out services for cooling tower past 3 years. During the period of installation the new Carrier chiller, we requested cooling tower manufacturer local representative to inspect the existing Cooling towers. Since there is no water filtration installed them manufacture recommended us to install a Lakos CT basin cleaning system which will improve the efficiency of cooling tower and for the new chiller. Since we replaced Chiller in the building highly recommend installing the cooling tower water filtration system which will reduce the break down for chillers and also reduce the leak on chiller tubs. Supply and install complete set of LAKOS –California, basin Cleaning system. Model-TCX-0400-SRV/415/3PH/50HZ/YD/50C, Flow Rate 400Gpm [91m3/hr. Supply and install SS skid, Strainer, Accessible separator, pressure gauge, SRV and Hydro boosters. Make concrete platform in cooling tower area and install pump set. Supply and install new High pressure PVC Pipe work connecting from cooling tower to new pump system and modify existing cooling tower water line and connect to newline. Supply and install 4core 25mm armor cable from basement pump room to cooling tower area 70mt fitted with weather proof isolator. Test and commission system Mechline Eurotek has successfully completed the work within the agreed time frame in order to honor our commitment to our new client and maintain the trust of our existing client. 20141027_104554 20141027_104606 20141027_104609 20141027_104616 20141027_104620 20141027_104625 20141027_104722 20141027_104727 20141027_104731 20141027_104733 Load More End of Content.
DEWA – Cooling Tower

IMG_1962 </h2 > Further to our discussion and subsequent to our site meeting with you and by reviewing the Technical specifications provided to us, we are pleased to submit our quote which include one no’s of cooling tower Roof deck repairs & motor/Gear box overhauling. To isolate the main cooling tower water inlet and outlet gate valves. Isolate electrical power supply for motor. Dismantle motor /gearbox from tower hood using crane. Dismantle the crating & hand railings from the CT tower hood. Dismantle all C channels from the hood and shift hood to roof floor level. Fabricate new C channels 4”X2”X6mm with sandblasting, galvanizes and epoxy coated frame and install it on CT hood with SS Nuts & Bolts. Dismantle motor take to workshop replace bearings and re varnish winding and epoxy paint motor and install SS fan guard for motor. Dismantle gear box and inspect any damages for gear if no damages clean and re assemble and fill new gear box oil and epoxy paint gearbox. Install motor and gear box on new Frame work fitted on CT hood. Install the complete CT Hood on Cooling tower, install new oil line. Epoxy paint existing metal crating and install on CT roof deck. Supply and install 1” round tube frame work for safe guard for CT matching with existing size. Connect the fan blades, electrical cables test run and do fan blade alignments. Mechline Eurotek Contracting has submitted a quotation to DEWA, which has been met with satisfaction from the client who fully comprehends the detailed work description. Upon completion of the project, the client expressed happiness and complete satisfaction. IMG_1953 IMG_1954 IMG_1955 IMG_1956 IMG_1957 IMG_1958 IMG_1959 IMG_1960 IMG_1961 IMG_1962 Load More End of Content.
Al Showaib Real Estate

FAHU(Fresh air Handling unit) installation work at Deira site (12) </h2 > In reference to the complaint registered towards the faulty FCU, we found that the blower is damaged and need to be repaired. Considering the age of the unit, we advise the replacement of the FCU to a higher capacity to increase the cooling effect inside the office. We are pleased to quote for the replacement work. Isolate the area Supply and Install new 3TR FCU [Chilled Water] Tap and extend the chilled water 1’’GI piping with welding and insulation from the existing chilled water line to new chilled water FCU Supply and install new drain line and connect to existing drain point. Supply and install existing cables and power supply to the new FCU. Supply and install one number of thermostat Testing and Commissioning and handover the unit. Clear the area. Mechline Eurotek has successfully completed the work within the agreed time frame in order to honor our commitment to our new client and maintain the trust of our existing client FAHU(Fresh air Handling unit) installation work at Deira site (3) FAHU(Fresh air Handling unit) installation work at Deira site (4) FAHU(Fresh air Handling unit) installation work at Deira site (5) FAHU(Fresh air Handling unit) installation work at Deira site (6) FAHU(Fresh air Handling unit) installation work at Deira site (7) FAHU(Fresh air Handling unit) installation work at Deira site (8) FAHU(Fresh air Handling unit) installation work at Deira site (9) FAHU(Fresh air Handling unit) installation work at Deira site (10) FAHU(Fresh air Handling unit) installation work at Deira site (11) FAHU(Fresh air Handling unit) installation work at Deira site (12) Load More End of Content.
Al Showaib Real estate

Chiller Coil replacement work (3) </h2 > With reference to our client request in regards with the coil replacement and as per our site inspection, we are pleased to quote for the request. Find the below scope of work and most competitive price for the above work in the subjected villa. Dismantle the unit Release the Gas from the unit, Dismantle the coil from the unit Clean the unit Supply and installation of 1 No’s of condenser coil and Brace the coil to the unit Replace the refrigerant dryer filters 2 No’s Vccumise the unit, Check if there is any leak, fill top up gas Install the panel covers Start and commission the unit. Mechline Eurotek the work is finished within the agreed time frame to uphold our commitment to our new client and upholding the trust of our existing client Chiller Coil replacement work (2) Chiller Coil replacement work (1) Chiller Coil replacement work (4) Chiller Coil replacement work (3)
The First Investors

WhatsApp Image 2023-08-09 at 3.21.35 PM </h2 > First Investors is a highly esteemed client with whom we are fortunate to collaborate. In the event that their clients assign any projects, we guarantee swift communication with Mechline Eurotek Contracting. At present, our team is diligently conducting a comprehensive site inspection to evaluate its condition, and we will subsequently furnish a comprehensive quotation that encompasses competitive pricing and unparalleled quality. The scopes of work encompass mechanical works, electrical works, and crane work. Based on this Mechline Eurotek Contracting has submitted a quotation to Net.com Building, which has been met with satisfaction from the client who fully comprehends the detailed work description. Upon completion of the project, the client expressed happiness and complete satisfaction. WhatsApp Image 2023-08-09 at 3.21.35 PM (3) WhatsApp Image 2023-08-09 at 3.21.35 PM (2) WhatsApp Image 2023-08-09 at 3.21.35 PM (1) WhatsApp Image 2023-08-09 at 3.21.35 PM
Al Showaib Real estate

AHU refubrishment Deira tower (3) </h2 > The Deira Tower Building is managed by Al Showaib Real Estate. In case of any necessary repairs, the client will reach out to Mechline Eurotek Contracting, and we will promptly address the issue. As a result, we received a service request from the site. The AHU & FAHU have identified issues with the blower wheel and motors, as well as rust on the blower drum and base. There is a risk of a major breakdown if not addressed promptly, necessitating replacement. Mechline Eurotek Contracting has provided an estimate for the necessary repairs at a competitive rate and finished the project within the agreed-upon timeframe. AHU refubrishment Deira tower (1) AHU refubrishment Deira tower (4) AHU refubrishment Deira tower (3)
AC Installation

20140508_132852 </h2 > In response to the inquiry and following the site visit conducted, we are enclosing the project drawings. We are delighted to provide a quotation for the project, inclusive of complete supply and installation of air conditioning units along with all necessary electrical work completed by our team. Mechline Eurotek Contracting has delivered a quotation for the essential repairs at a competitive price and successfully completed the project within the agreed-upon timeframe 20140508_111204 20140508_123327 20140508_132151 20140508_132213 20140508_132218 20140508_132629 20140508_132653 20140508_132720 20140508_132746_LLS 20140508_132852 Load More End of Content.