Mechline Eurotek Contracting

Legent Plaza, Dubai, UAE

Chiller Water Pipe Insulation Replacement

 

First Investors is a valued client with whom we have the privilege of collaborating. If any projects are assigned by their own clients, we ensure prompt communication with Mechline Eurotek Contracting. Refer to your request from the client we inspected the building and carried out full detailed survey, based on that we are send the Quote with detailed Scope of work and Best Price. Mechline Eurotek Contracting carried out the work as per the below mentioned Building Floor Details:

 

 Basement- 3 Floor + Ground floor + Mezz Floor + 1 to 16 Floor + HC Floor (17 Floor)

 

 Apartment: 2BHK, 3BHK, 4BHK

 

Total Pipe Length – 2391mt (Supply & Return Pipe Line)

 

Total FCU – 120 Nos Total Gypsum Celling Opening – 1800sqmt.

 

Regarding these measurements, we successfully finished the entire ceiling installation and insulation of the chiller water pipes. The completion of this task was accomplished within the agreed-upon timeframe. Following the conclusion of the project, Mechline Eurotek Contracting provided a comprehensive report on the building’s completion, That includes the signature of each tenant residing in the apartments. Currently, our client expresses contentment with our work, and the tenants also express their satisfaction.

Solverwp- WordPress Theme and Plugin